Boz (1st phase of security measures, 2017)
Measures: Repair of the ring wall covering, cleaning up, re-placing bricks, supporting endangered parts of the old school building, removal of bird droppings from the attic
Employed means: 1.300 EUR Donations
Gallery:
- ring wall covering (before)
- ring wall (before)
- ring wall (after)
- ring wall (after)
- (before)
- (after)
- ring wall (after)